Name
The Signs of NFPA 25
Date & Time
Thursday, October 16, 2025, 2:30 PM - 3:30 PM
Location Name
Chesapeake A-C
Track
ITM
Description

Proper signage is a critical component of every water-based fire protection system. While it is necessary for the inspectors and technicians that perform the ITM functions to be knowledgeable and properly trained to perform their assigned tasks, in many cases these cannot successfully be carried out without proper signage. Most signage is required by the installation standard, however, in some cases, NFPA 25 requires more information on a sign than what the installation standard required. This seminar will review every sign required to be inspected by NFPA 25, including some that are required to be “retrofit” by the standard.

Terry Victor
CEU
0.1
CPD
1
Contact Hours
1